PROJECTS · 2008–2026

Our projects.

Explore our work by location or sector. Select a project to see the details.

SECTOR
USA
BROWSE THE PORTFOLIO

Filter by sector or service.

83 projects shown. Filters update the list and the map in real time.
SECTOR
SERVICE
01
Sound Transit East Link Light Rail Extension
ProDims supported Sound Transit’s $2.8B East Link Extension from 2012 to 2015 with project
Transportation
Seattle / Bellevue, WA
$2.8B · 2012–2015
02
King County International Airport (Boeing Field) ARFF Facility
ProDims provided cost estimating for the new Aircraft Rescue and Firefighting facility at
Aviation
Seattle, WA
2014
03
Stevenson Elementary School
ProDims provided schematic design, design development, and 90% contract document cost esti
Education
Bellevue, WA
$47.3M · 2018
04
King County Metro Bellevue, Atlantic and Central Lift Replacement
ProDims provided cost estimating for replacement of eight hydraulic lifts across King Coun
Transportation
King County, WA
8 lifts · 2021
05
Island Transit Whidbey Base Facility
ProDims provided conceptual-through-contract-document cost estimates for Island Transit’s
Transportation
Coupeville, WA
$22.4M · 2014
06
LOOP Vehicle Maintenance Facility
Project support for King County Wastewater Treatment Division's LOOP vehicle maintenance f
Water
North Bend, WA
12,500 sf · 2022
07
Boeing Field On-Call Planning
Cost estimating support for King County Airport planning work orders covering airfield, bu
Aviation
Seattle, WA
On-call · Active
08
C-TRAN Building Remodels and Expansions
Rough order of magnitude cost estimates for C-TRAN's administration building remodel/expan
Transportation
Vancouver, WA
ROM estimates · On record
09
S Concourse Evolution
ProDims provided design-phase cost estimating for the Port of Seattle’s S Concourse Evolut
Aviation
SeaTac, WA
Multi-year · Design complete
10
North Satellite Modernization
ProDims provided cost estimating on the AECOM team for the $300M North Satellite Moderniza
Aviation
SeaTac, WA
$300M · 2015
11
ADOT Technical Engineer Personnel IDIQ
ProDims provided construction scheduling and technical review support as an extension of A
Transportation
Phoenix, AZ
IDIQ · Apr 2019–Feb 2024
12
Paine Field Aircraft Rescue and Fire Fighting Station
Cost estimating for a new three-bay Aircraft Rescue and Fire Fighting station serving Pain
Aviation
Everett, WA
$4.5M · 2007–2009
13
Southworth Ferry Terminal Seismic Upgrades
ProDims provided cost estimating for seismic upgrades to the Southworth Ferry Terminal Bui
Transportation
Southworth, WA
75-year retrofit · On record
14
King County Metro H-Line
ProDims provided scheduling and inspection support for King County Metro’s RapidRide H-Lin
Transportation
Seattle, WA
RapidRide · Dec 2024
15
Kasch Park Operations and Maintenance Base
ProDims provided cost estimating for renovation and upgrades to Community Transit’s Kasch
Transportation
Everett, WA
Base renovation · 2011
16
Kasch Park Campus FMP-4 Feasibility Study
ProDims provided cost estimating for Community Transit’s Kasch Park Campus Facilities Main
Transportation
Everett, WA
Completed
17
Kasch Park Building A Fall Protection System
ProDims provides cost estimating for a rooftop horizontal fall arrest system at Building A
Transportation
Everett, WA
Active
18
KCIA Large Aircraft Parking
ProDims provided estimating and scheduling support for King County International Airport’s
Aviation
Seattle, WA
2021
19
Sound Transit East Link South Bellevue Corridor to Overlake
Design and construction phase safety representative support for the East Link light rail c
Transportation
Bellevue, WA
14 mi · On record
20
Lakewood Community Center
Preliminary design phase ROM conceptual estimates for approximately 50 improvements and re
Municipal
Lakewood, WA
50 scopes · On record
21
Central Kitsap Fire & Rescue Fire Station 45
Estimating services for replacement of Fire Station 45 with a new 7,600 sf station includi
Municipal
Bremerton, WA
7,600 sf · On record
22
Peanuts Park Renovation
Cost estimating for Pasco's $5.8M Peanuts Park renovation, reopening the downtown park and
Municipal
Pasco, WA
$5.8M · On record
23
Snohomish County PUD North County Community Office
Cost estimating support for a new North County Community Office with office, warehouse, ph
Municipal
Arlington, WA
40,900 sf · 2024
24
South Plant Aeration Basin Safety Access Improvement
Cost estimates for alternatives analysis, baseline and bid stages for safety access improv
Water
Renton, WA
Class 1-4 · On record
25
West Point Treatment Plant Primary Sedimentation Area Roof
Cost estimating for seismic resiliency options at West Point Treatment Plant, supporting r
Water
Seattle, WA
700,000 served · 2023
26
Lebanon Fire District Fire Station 31
Design-phase cost estimating for Lebanon's new Station 31 fire station and administrative
Municipal
Lebanon, OR
$16.1M · 2024
27
Eastgate Interceptor Rehabilitation Phase 3
Cost estimating for Phase 3 rehabilitation of 4,000 linear feet of corroded Eastgate Inter
Water
Bellevue, WA
4,000 LF · On record
28
Black Diamond Trunk Capacity Planning Evaluation
Pre-conceptual cost estimates for four alternatives to expand Black Diamond Trunk Line cap
Water
Black Diamond, WA
4 options · On record
29
Tiffany Park Elementary School Entry Hall Improvements
Cost estimating for entry improvements that enhance safety, security and visitor control a
Education
Renton, WA
3 security levels · On record
30
Des Moines Elementary School
Value engineering studies for a new $39M elementary school replacing an aging facility and
Education
Des Moines, WA
$39M · On record
31
Bellevue School District Transportation Facility
Cost support for a multi-phased bus and equipment maintenance facility delivered while the
Education
Bellevue, WA
32,283 sf · On record
32
River Ridge Elementary School
Cost estimating for a new elementary school on existing Kent School District property form
Education
Kent, WA
New school · On record
33
Fernwood Elementary School Modernization
Cost estimating support for Fernwood Elementary School modernization work for Northshore S
Education
Bothell, WA
Modernization · On record
34
Pop Keeney Stadium
Cost estimating for a field study at Pop Keeney Stadium, supporting a joint effort between
Education
Bothell, WA
Field study · On record
35
Puesta del Sol Elementary School
Cost estimating through schematic, design development and 90% contract document phases for
Education
Bellevue, WA
90% CDs · On record
36
Harborview Medical Clinic
ProDims provided scheduling and cost estimating support for conversion of two outpatient c
Government
Seattle, WA
36,000 sf · Completed
37
Central Pierce Fire & Rescue Fire Training Campus
Cost estimating for the master plan of a 4.9-acre fire training campus with live-fire, cla
Municipal
Puyallup, WA
4.9 acres · On record
38
McIntyre Hall Renovation
Concept-through-design estimating for exterior finish removal, new cladding systems, roofi
Municipal
Mount Vernon, WA
Envelope renovation · On record
39
Seattle Municipal Tower Building
DD and CD cost estimating for City of Seattle tenant improvements on floors 18 through 22
Government
Seattle, WA
Floors 18-22 · On record
40
Sky Harbor Terminal 4 North Concourse 4 PBB Replacement
ProDims provided cost estimating services for the Phoenix Sky Harbor Airport Terminal 4 Pa
Aviation
Phoenix, AZ
PBB package · 2024
41
New Alaska Airlines Cargo Facility
ProDims provided comprehensive cost estimating for the new Alaska Airlines Cargo Facility
Aviation
Juneau, AK
30,500 sf · 2024
42
Alaska Airlines Portland Mainline Hangar
ProDims provided comprehensive cost estimating to support the 35% schematic design phase o
Aviation
Portland, OR
3-bay hangar · 2022
43
ADOT EV Chargers at 5 Locations Statewide
ProDims provided comprehensive cost estimating to support ADOT’s statewide installation of
Transportation
Statewide, AZ
5 locations · 2025
44
Site Reclamation for BESS Facility
ProDims provided reclamation cost estimating to meet Macon County municipal code bond requ
Commercial
Macon County, IL
Bond estimate · 2024
45
NWS Honolulu Weather Forecast Office Relocation
ProDims provides comprehensive cost estimating for the relocation of the NWS Honolulu Weat
Federal
Honolulu, HI
Milestone estimates · 2025
46
Tech Mahindra 5G Lab Data Center Tenant Improvements
ProDims provided conceptual ROM cost estimating for 22,000 SF tenant improvements at the M
Commercial
Redmond, WA
22,000 sf · 2023
47
Tacoma Water Headworks Master Plan
ProDims provided cost estimating for Tacoma Water’s 30-year Headworks Master Plan for futu
Water
Tacoma, WA
30-year plan · 2024
48
Port of Vancouver Clean Ports Electrical Infrastructure
ProDims provided cost estimating for the Port of Vancouver’s Clean Ports Electrical Infras
Transportation
Vancouver, WA
Shore power + crane · 2026
49
Port of Everett Pier 3 Electrical Infrastructure
ProDims is providing cost estimating and electrical integration services for the Port of E
Transportation
Everett, WA
60% design · 2024
50
Suquamish Tribe Public Safety Emergency Ops Center
ProDims provided cost estimating to support the Suquamish Tribe in planning and predesign
Municipal
Suquamish, WA
Predesign · 2025
51
Alamogordo Fire Station #2 Phase 2
ProDims provided construction cost estimating for the renovation of Alamogordo Fire Statio
Municipal
Alamogordo, NM
Renovation · 2025
52
City of Bayard Fire Station Expansion and Renovation
ProDims provided cost estimating for the City of Bayard Fire Station expansion and renovat
Municipal
Bayard, NM
SD / DD · 2025
53
Spokane International Airport (GEG) 2-Bay Narrow Body Hangar
ProDims provided cost estimating services for the Spokane International Airport (GEG) 2-ba
Aviation
Spokane, WA
2-bay hangar · 2026
54
Dept. of Ecology EAP Laboratory Predesign
ProDims provided cost estimating services for the Washington State Department of Ecology E
Government
Lacey, WA
Predesign · 2024
55
USDA Wapato Lab Renovation
ProDims provided cost estimating for renovation of the USDA Temperate Tree Fruit and Veget
Federal
Wapato, WA
35% / 50% / 95% · 2026
56
Curry General Hospital Phase 1 Infusion Expansion
ProDims provided cost estimating for the Phase 1 expansion of Curry General Hospital in Go
Municipal
Gold Beach, OR
5,500 sf · 2023
57
Yakima Air Terminal Upgrades Phase 1A
ProDims provided cost estimating for Yakima Air Terminal passenger terminal and curbside c
Aviation
Yakima, WA
Phase 1A · 2024
58
Spokane International Airport TREX
ProDims provided cost estimating to the design team for the Spokane International Airport
Aviation
Spokane, WA
Phase 1 study · On record
59
Bellingham Airport Rental Car Facility
ProDims provided conceptual construction cost estimates for the Port of Bellingham’s Belli
Aviation
Bellingham, WA
Conceptual · On record
60
Port of Seattle T18 Shore Power Independent Estimate
ProDims provided an independent cost estimate for the Terminal 18 Shore Power Project elec
Transportation
Seattle, WA
90% design ICE · 2024
61
Port of Seattle Pier 69 Conditions Assessments
ProDims provided cost estimating for the planning phase of the Pier 69 rehabilitation proj
Transportation
Seattle, WA
Planning · On record
62
Port of Seattle Pier 69 Privacy Rooms Full Design
ProDims provided cost estimating to support refurbishment of the Pier 69 privacy rooms, de
Transportation
Seattle, WA
Full design · On record
63
Port of Seattle CEM Terminal 5 Freight Corridor Study
ProDims provided cost estimating for the freight corridor feasibility study evaluating a n
Transportation
Seattle, WA
Feasibility · 2025
64
Tongue Point Seawall and Seaplane Ramp Study
ProDims provided cost estimating for the Seawall and Seaplane Ramp Study at the Tongue Poi
Federal
Astoria, OR
Study · 2024
65
Canby Area Transit Operations Facility
ProDims provided cost estimating for the Canby Area Transit Operations Facility — a new 4,
Transportation
Canby, OR
7,500 sf · 2024
66
Skagit Transit Maintenance & Operations
ProDims provided cost estimating for the 66,000 SF Skagit Transit Maintenance and Operatio
Transportation
Burlington, WA
66,000 sf · 2024
67
Ben Franklin Transit Queensgate Hub
ProDims provided 60%, 90%, and 100% cost estimating for the buildings and bus shelters on
Transportation
Richland, WA
60–100% estimates · On record
68
Pierce Transit 2030 Base Master Plan
ProDims provided cost estimating in 2011 for Pierce Transit’s 2030 Base Master Plan, suppo
Transportation
Pierce County, WA
Master plan · 2011
69
Smokey Point TC Swift BRT Gold Line Terminal
ProDims is providing cost estimating to support the Smokey Point Transit Center expansion
Transportation
Arlington, WA
Transit expansion · Active
70
Mukilteo Ferry Terminal Phase 2
ProDims provided landside buildings cost estimating for the $230M Mukilteo Ferry Terminal
Transportation
Mukilteo, WA
$230M project · On record
71
Vashon Island Ferry Terminal Seismic Upgrade
ProDims provided cost estimating for seismic upgrades to the Vashon Island Ferry Terminal
Transportation
Vashon Island, WA
75-year retrofit · On record
72
Bainbridge Island Ferry Terminal Improvements
ProDims provided cost estimating for the proposed expansion and modification of the Bainbr
Transportation
Bainbridge Island, WA
Multi-alternative · On record
73
First Hill Streetcar Maintenance Facility
ProDims provided conceptual and design-phase construction estimates for the First Hill Str
Transportation
Seattle, WA
3-bay facility · On record
74
Bellevue 130th Street Parking Garage
ProDims provided planning-level cost estimating for a 4-story parking garage with street-f
Transportation
Bellevue, WA
4-story garage · On record
75
Gateway Transit Oriented Development Study
ProDims provided cost estimating for the Gateway Center TOD feasibility study in Bremerton
Transportation
Bremerton, WA
Feasibility study · On record
76
Chehalis Fire Department Headquarters
ProDims provided conceptual design cost estimating for the Chehalis Fire Department Headqu
Municipal
Chehalis, WA
Conceptual design · On record
77
East Pierce Fire & Rescue Station 124
ProDims provided cost estimating for East Pierce Fire & Rescue Station 124 at 1515 11th Av
Municipal
Milton, WA
Feasibility–permit · On record
78
Tumwater T-2 Fire Station Remodel / Expansion
ProDims provided cost estimating for the $7.6 million renovation of Tumwater’s T2 North En
Municipal
Tumwater, WA
$7.6M · Completed
79
Shoreline Park Facilities ADA Transition Plan
ProDims provided cost estimating for the City of Shoreline Parks ADA Transition Plan — ass
Municipal
Shoreline, WA
ADA transition · On record
80
Carco Theater & Bronson Park Shop Assessments
ProDims provided cost estimating to support building assessments for the historic 300+ sea
Municipal
Renton, WA
Building assessments · On record
81
Winters House Renovation
ProDims provided cost estimating for restoration of the historic Winters House in Bellevue
Municipal
Bellevue, WA
75% CD estimate · On record
82
Dr. Jose Rizal Play Area Renovation
ProDims provided cost estimating for the Dr. Jose Rizal Park renovation — Phase One restro
Municipal
Seattle, WA
Two-phase · On record
83
Lewis County Night by Night Shelter
ProDims provided cost estimating for adaptive reuse of an existing bank building into the
Municipal
Centralia, WA
Adaptive reuse · On record